Product module

Review a bid package and open the clause behind every finding.

Cross-check the bid package, addenda, and drawings; identify what changed and return to the exact page before locking scope, schedule, or price.

Review breaks down when a finding is separated from the document that proves it.

In LPN-008/2025, a question deadline, schedule change, or drainage omission can alter the bid. The team must find the requirement and verify it in the source.

Scattered dates

Bid close, questions, and responses appear in different clauses and addenda.

Unreconciled changes

One addendum may preserve a date while changing scope or milestones in the same circular.

Priceable decisions

Before carrying an item or issuing an RFI, the estimator must open the clause and confirm it is current.

Real cited review workflow

The team attaches sources to the message, and Converza can return numbered citations. Opening one shows the passage when the PDF has verifiable text or the full page when it is a scan.

1

Find requirement

The user asks when clarifications are due. The answer links ITB 7.1 on page 22 of the bid package.

2

Review the current addendum

The agent compares the attached Addendum 02 and LPN-008/2025 bid document and organizes candidate changes, continuities, and impacts for human review.

3

Open citation

A citation opens highlighted text when the PDF supports it; scans open at the page or sheet for visual inspection.

4

Risk table

The output groups severity, impact, and recommended action with visible source for human review.

Cited Review capabilities

Built to accelerate review and drafting with visible sources.

  • Citations by page, section, or sheet
  • Addenda review
  • Assisted comparison of selected documents
  • Risk table
  • Human validation

The same LPN-008/2025 package, from clause to bid decision

Every view keeps the Comunidad Italia project, bid documents, and references the team must review.

View 1

Confirm the clarification deadline

Workflow

  1. 1Review documents
  2. 2Validate source
  3. 3Prepare output

View 2

Compare Addendum 02 against the base package

Workflow

  1. 1Attach Addendum 02
  2. 2Open source
  3. 3Review changes
  4. 4Assign action

View 3

Open ITB 7.1 in the original bid package

Workflow

  1. 1Review documents
  2. 2Validate source
  3. 3Prepare output

View 4

Risk table

Workflow

  1. 1Review documents
  2. 2Validate source
  3. 3Prepare output

Test Cited Review with your documents.

Book a demo and review a real workflow from your team.