PRE-BID RFI · DRAFT
RFI-007 · Waterproofing and facade interface
San Martín Education Center · LPN-014/2026
During our review of the bid package, we identified a difference between the system described in the specifications and the interface shown in the drawings.
Clarification requested
Confirm the compatible membrane type, minimum upturn height, and whether perimeter sealing must be included in the base bid.
A response is requested by August 12 so the scope and cost can be included in the bid.