Bidding & preconstruction

Estimate closeout

Validate quantities, scope, and line items before you finalize the estimate.

Converza cross-checks your estimate against drawings, specs, addenda, and quotes to surface differences with verifiable sources.

Before and after

The operational shift is from scattered manual review to document queries with available sources and reviewable drafts.

Before

The estimator jumps between Excel, drawings, specs, addenda, and quotes to check every line item before bid close.

After

Converza collects candidate differences in a cited matrix so the estimator can decide what to adjust, clarify, or document.

A real estimate review workflow

The estimator directs the review from chat, verifies each finding in its source, and records the decision before updating the estimate.

1

Call the estimate and its sources

Attach Site Estimate.xlsx, C-301, Section 32 13 13, and Addendum 02 to the review message.

2

Cross-check a critical line item

Ask Converza to compare quantity, unit, scope, and documented changes for a specific line item or trade.

3

Verify findings with citations

Converza returns candidate differences and lets the estimator open the note, section, or addendum behind each finding.

4

Record the bid-close decision

The estimator decides whether to revise a quantity, add a line item, keep an assumption, exclude scope, or draft an RFI.

Output example

A working format the team can review, correct, and move into its internal process.

Documents used

Converza works from the project document package and keeps sources visible.

  • Excel estimates
  • Drawings
  • Specifications
  • Addenda
  • Subcontractor quotes

Personas

Teams typically involved in this workflow.

  • Estimating engineer
  • Estimating lead
  • Preconstruction manager